Snapshots
A snapshot is a saved engagement report, built from the iMatter scorecards you choose for a period, with the ratings, the comments behind them and a written analysis.
Every iMatter asks a person to score your organisation's engagement indicators from 1 to 10 and to say what is driving each score. A snapshot brings those scores and comments together for a period you choose, so you can see how people feel about work, where it differs between groups, and what to do about it.
Only Admins see Snapshots in the sidebar.
What a snapshot holds
Ratings. The overall engagement rating, the rating for each engagement indicator, and the same again for each region, department and lead.
Comments. What people wrote, beside the rating it explains.
Analysis. Key themes, risks, opportunities and strategy, written by WeMatter from the ratings and comments, with the quotes each point rests on.
A comparison, if you chose an earlier period: what improved, what declined and by how much.
See Read a snapshot for where each of these is.
A snapshot is saved, not live
A snapshot records the scorecards it was built from at the moment you generate it. Nothing in it changes afterwards, even if a scorecard is later reopened, a person moves department or someone changes their lead. That makes it a stable document to discuss and come back to.
To see newer scorecards, create a new snapshot. The only thing you can change on an existing one is its title.
Signals is different. Its dashboards are always up to date and are not saved.
Which scorecards count
A scorecard can be included once its iMatter is submitted. The uMatter and the workshop are not needed, because engagement is the person's own view.
A snapshot takes each score and comment as it stands when you generate it. If a workshop has already changed one, the snapshot holds the changed one.
Each person counts once in a period, with their latest iMatter in that period. Archived and deleted scorecards are left out.
Snapshots contain personal information
A snapshot names people beside their ratings and their own words. Treat it as you would any personnel record.
Inside the platform, only Admins can open snapshots.
A snapshot can be shared outside the platform with a link, either in full or as an anonymous version. Both links are off until you turn them on. See Share or download a snapshot.
Find a snapshot
Snapshots lists every snapshot for your organisation, newest first, with its period, the number of scorecards in it and its status.
| Status | Meaning |
|---|---|
| Queued, Generating, Finalising | The snapshot is being written. The row shows how far it has got. |
| Ready | The snapshot is complete. Select it to read it. |
| Ready · narrative unavailable | The ratings are complete and the written analysis could not be produced. |
| Failed | The snapshot could not be completed. Select Retry on its row. |
Search by title or by the name of the person who created it.
How snapshots are calculated explains every figure.
What you can do in Snapshots
- Create a snapshot Choose a period, check which scorecards it includes, and generate an engagement snapshot.
- Read a snapshot Find the overall engagement rating, see which indicators and groups stand out, and read the comments and analysis behind them.
- Share or download a snapshot Give someone outside your Admins a link to a snapshot, in full or anonymously, or download its data.
- Rename or delete a snapshot Give a snapshot a clearer title, or remove one you no longer need.
- How snapshots are calculated Where every figure in a snapshot comes from, how ratings and changes are worked out, and how the written analysis is produced.